Evaluates the performance of the Bhadra Reservoir Project-before, during, and after the introduction of modernization with structured system design. Analysis focuses on water management, agricultural productivity, and farmer participation and perception. Identifies the absence of a continuing support mechanism and lack of farmer participation as the major causes for the project's decline.
This paper on Water for Rural Development is divided into two parts. The first part outlines the most important issues from IWMI's point of view on water for rural development, with a focus on developing countries. This part identifies, discusses and provides recommendations for key areas for interventions in water resources development and management in the context of rural development. The second part of the document provides analyses of present and future water resources in the World Bank's defined regions.
Sri Lanka is a country with vast spatial and seasonal variations of water supply and demand. Statistics in the form of aggregated information at national level sometimes mask issues of local water scarcity. But when the same indicators are used at subunit level, a substantial area of the country comes under severe water-scarce conditions. Knowledge of subunit level water scarcities is very important because most of the food requirement of the country at present comes from water-scarce regions and projected additional requirements are also to be met by the same regions.
Studies the low-cost alternative strategy of selective lining of watercourses to reduce seepage and increase irrigated areas in the Indian subcontinent. Satellite remote-sensing (SRS) is seen as a cost-effective evaluation tool in view of its large area of synoptic and repetitive coverage.
Evaluates the performance of the Bhadra Reservoir Project-before, during, and after the introduction of modernization with structured system design. Analysis focuses on water management, agricultural productivity, and farmer participation and perception. Identifies the absence of a continuing support mechanism and lack of farmer participation as the major causes for the project's decline.
Background on the gal oya left bank system and its rehabilitation; The intervention impact assessment model; Results from the impact assessment analysis; Comparison wuth other studies and observations; Evaluation of the importance of exogenous variables; Evaluation of the impacts of rehabilitation.